Showing results 1 to 4 of 4
Search took 0.00 seconds.
Search: Posts Made By: tim griffin
Forum: Engines & props 09 January 2013, 06:28
Replies: 9
Views: 1,656
Posted By tim griffin
lol My thoughts as well I no times are hard...

lol
My thoughts as well I no times are hard but whacking the hours on a job is taking the pee in my mind.

Awell know marine engineering firm over here used to do that took them 5 hours to...
Forum: Engines & props 08 January 2013, 18:34
Replies: 9
Views: 1,656
Posted By tim griffin
Does seem a long time will look elswhere I think ...

Does seem a long time will look elswhere I think
Cheers
Tim
Forum: Engines & props 08 January 2013, 15:52
Replies: 9
Views: 1,656
Posted By tim griffin
Yes from engine to throttle

Yes from engine to throttle
Forum: Engines & props 08 January 2013, 11:26
Replies: 9
Views: 1,656
Posted By tim griffin
How long to change a cable

Just been quoted 3 hours to change a throttle cable on a ETEC 200 to a commmand throttle on a 7 m rib.
Seems along time was expecting 1.5 hours tops .
Any mechanics who could explain why so long...
Showing results 1 to 4 of 4

 


All times are GMT. The time now is 18:54.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.