Reply
 
Thread Tools Search this Thread
 
Old 17 February 2013, 14:26   #1
Member
 
ribraff's Avatar
 
Country: UK - England
Town: Dartmouth
Length: 6m +
Join Date: Feb 2003
Posts: 1,209
Double Console Bare Moulding

This came out of the mould a while ago, has ply glassed in for the Helm and Instruments.
Comes with a curved panel to go in under the instrument panel which will need fitting.
Has a few scratches which will flat and polish out so sold as seconds.

125
Attached Thumbnails
Click image for larger version

Name:	image-348793686.jpg
Views:	120
Size:	49.3 KB
ID:	76735   Click image for larger version

Name:	image-2874879843.jpg
Views:	93
Size:	47.0 KB
ID:	76736  
__________________
Hypalon Tubes built in-house,retubing, repairs, Accessories
www.ribtube.co.uk
ribraff is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





Copyright 2002- Social Knowledge, LLC All Rights Reserved.

All times are GMT -5. The time now is 04:43.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2017, vBulletin Solutions, Inc.